— Project

Intel Central Utility Building

— Location

Santa Clara, CA

— Role

Schematic Design to Design Development, Construction Administration

— DATE

Projected Completion 2026

Spearheaded the architectural design for Intel’s new ~17,000 SF Central Utility Building, engineered to support both existing & future cleanrooms at a cutting-edge microprocessor mask production facility.


The facility accommodates critical mechanical systems, including chillers, cooling towers, pumps, piping, instrumentation & control equipment, & emergency backup generators, ensuring seamless operational efficiency and scalability for advanced semiconductor manufacturing.